PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Backfilling Elev 5-6. pit Foundation Walls Facing West (800x600).jpg Lifting the Slip Forms at Elev. 1,2,3 2nd Floor Facing South (800x600).jpg Movign the fence at Lyon Street Facing North (800x600).jpg Footing layout at Elev. 7-Stair -4,5 Facing West (800x600).jpg Footing layout Elev. 7-Stair -4,5 Facing East (800x600).jpg Movign the fence at Lyon Street Facing South-West (800x600).jpg Rebar Mats for Elev. 1,2,3 Shear walls 2nd floor(800x600).jpg Stripped Elevator 5-6 Facing North-East (800x600).jpg Waterproofing around Elevator pit walls Facing North-East(800x600).jpg
Previous pageNext page Footing layout Elev. 7-Stair -4,5 Facing East (800x600)
Footing layout Elev. 7-Stair -4,5 Facing East (800x600)